Bottom line: A vague RFQ gets a vague price. To receive comparable quotes, send every supplier the same structured request: exact model and spec, battery and motor numbers, quantity and mix, target market and certification, incoterm, packaging and delivery date. This removes the guesswork that causes a "price" to change after you pay the deposit.
Why do quotes from different suppliers never match?
Because each supplier fills in the missing information differently. One quotes a lead-acid version, another lithium; one includes a Charger, another does not; one assumes EXW, another FOB. An RFQ that leaves these open invites lowball quotes that later rise. Standardizing the request is the single highest-leverage thing a buyer can do before negotiating price.
What technical details belong in an RFQ?
Include, at minimum:
- Model / SKU and whether it must be EEC/CE compliant for your market.
- Motor: continuous rated power and Peak Power, hub or Mid-Drive.
- Battery: chemistry (LFP/NMC), voltage, capacity in Ah and Wh, cell brand if specified.
- Range and top speed under a stated test condition.
- Brakes, tyres, suspension and any must-have components.
- Charger type and plug standard for your country.
If you are not sure how to read these numbers, our guide on reading a specification sheet explains each field.
Which commercial terms must be stated?
Add quantity per model, target price if you have one, incoterm (EXW/FOB/CIF), destination port, expected delivery date, payment terms, packaging requirement, and whether you need OEM logo/colour and spare parts. State the certification documents you require with the quotation — for EU buyers, that may mean CE DoC, EN test report and battery UN 38.3 summary. This aligns your RFQ with the document checklist for EU registration.
How should I format and send it?
Send a short cover note plus an attached spreadsheet with one row per model and one column per attribute. Ask suppliers to fill in the sheet rather than write a free-form email. Set a clear deadline and ask for a validity period on the quote (prices for batteries can move). Send to a comparable set of suppliers so you can compare like for like.
What should I do with the replies?
Normalize them into one comparison table: unit price, battery spec, included accessories, incoterm, lead time, MOQ and payment terms. The cheapest line is rarely the best if the battery or certification differs. Use the sample order vs container approach to validate the winning quote with a physical sample before scaling.
Frequently asked questions
Should I ask for a price range or an exact price?
An exact price at a stated quantity. Ranges hide assumptions and cannot be compared.
Do I need to share my target price?
Only if it helps suppliers propose the right spec. Sharing a very low target often returns a downgraded configuration rather than a better price.
How many suppliers should I RFQ?
Three to five is a practical range: enough to compare, few enough to manage replies properly.
Sources and verification notes
- RFQ structure reflects standard B2B sourcing practice; export guides describe quotation steps including price, MOQ and Shipping terms (Shilumoto import guide, 2026 — third-party, not independently verified).
- General guidance only.







Add comment
Add comment: