Selling Electric Two-Wheelers in India: AIS-156 and Type Approval

sinescooter 1970-01-01 Industry News 16 0
A⁺AA⁻

India does not recognise a CE mark, an EEC Type Approval or a Chinese CCC certificate as evidence that an electric two-wheeler may be sold there. Every L-Category electric two-wheeler placed on the Indian market needs its own type approval under Rule 126 of the Central Motor Vehicles Rules, and the Battery Pack inside it has to demonstrate AIS-156 Compliance — including a thermal propagation test with no direct equivalent in the European framework. Importers who budget for one approval and then discover they need two, at different stages, with different sample requirements, are the ones who miss their launch window.

How India regulates electric two-wheelers

Electric two-wheelers in India fall into the L category — L1e for low-speed mopeds and L3e for Motorcycles — and are regulated by the Ministry of Road Transport and Highways (MoRTH) under the Motor Vehicles Act 1988 and the Central Motor Vehicles Rules 1989. The framework has three layers that are often confused with each other, and treating them as one is the most common planning error.

The first layer is vehicle type approval. Rule 126 requires every manufacturer or importer to submit a prototype to a notified testing agency and obtain a Type Approval Certificate confirming that the vehicle complies with the Act and the Rules. This covers the whole vehicle: braking, lighting, tyres, mirrors, speedometer, noise, electromagnetic compatibility and the electrical safety of the traction system. The certificate is issued for a specific model and variant, tied to the manufacturing location, and it is the document customs and the regional transport offices look for.

The second layer is component safety standards, published as AIS (Automotive Industry Standards) by the Automotive Research Association of India with the technical committee process. AIS-156 governs the rechargeable energy storage system for L-category vehicles. AIS-038 Rev. 2 is the equivalent for M and N category vehicles, so a battery developed for a car cannot simply be carried across to a scooter without re-testing against the L-category standard.

The third layer is BIS certification under the Bureau of Indian Standards. Certain lithium-ion cells and packs must carry the ISI mark against Indian standards, and chargers fall under the IS 17017 series. BIS is a separate application to a separate authority. A vehicle type approval certificate does not substitute for it, and a BIS licence does not substitute for the vehicle approval.

India also drives on the left, which changes lighting cut-off patterns, mirror geometry and the side on which the rear reflector and side stand are expected. A model engineered for right-hand-traffic Europe is not automatically a compliant Indian product even if the hardware is otherwise identical, and the difference shows up at the test house rather than at the drawing board.

AIS-156: what the standard actually tests

AIS-156 is a pack-level and system-level standard, not a cell datasheet exercise. Amendment 3, announced in September 2022, is the version that reshaped the market: it introduced thermal propagation assessment, an audio-visual thermal warning to the rider, microprocessor-based BMS requirements, accredited cell-level testing, pack-level fusing, IPX7 ingress protection for the pack, and charger safeguards. The provisions were phased in from 1 December 2022, with Phase 2 mandatory from 31 March 2023.

The mechanical and environmental tests are familiar from other markets. Vibration simulates a vehicle lifetime of road input and is the test most likely to expose a poorly supported internal harness or an under-torqued busbar. Thermal shock and thermal cycling stress the joints between dissimilar materials. Mechanical shock and drop represent handling damage in transit and a vehicle falling over. Crush applies a defined force to the pack to check that the enclosure does not short the cells. Low-pressure testing represents air transport and high-altitude operation. Immersion at IPX7 represents a pack submerged in water for a defined period, which matters in a monsoon market far more than in northern Europe.

The electrical abuse tests are where pack design gets decided. External short circuit checks that the BMS interrupts current before the conductor or the cells are damaged. Overcharge and over-discharge check the protection thresholds and, critically, that protection still works when the pack is at the edge of its temperature window. Over-temperature testing checks the cut-off behaviour and the recovery logic. Insulation resistance and dielectric strength testing check isolation between the high-voltage circuit and the chassis, which is a safety requirement and also an EMC one.

The thermal propagation test is the centrepiece and the reason so many packs fail on the first submission. A single cell is deliberately driven into thermal runaway — by localised heating, by nail penetration or by overcharge, depending on the agreed procedure — and the pack must demonstrate that the event is contained or at least slowed so that it does not cascade through neighbouring cells. The vehicle must also warn the rider before a hazardous condition develops. A pack built as a dense brick of large-format cells with no internal barrier, no vent path and no thermal gap between modules has nowhere for that energy to go, and no amount of BMS firmware fixes a geometry problem. Designs that pass tend to share the same features: cell spacing or a mica/ceramic barrier between groups, a defined vent direction that does not exhaust into the rider's leg or the wiring loom, a fuse or fusible link per parallel string, and a BMS that measures temperature at multiple points rather than at one.

Two details trip up suppliers repeatedly. First, cell-level testing must be carried out at an accredited laboratory, and the accreditation of the cell test report is checked independently of the pack report — a supplier who tested cells in-house has no evidence. Second, the pack must be tested as delivered, in its production configuration. A hand-built sample with extra insulation tape and a machined aluminium cover is not the article that will ship in a container.

The type approval route under CMVR Rule 126

The route starts with an application to a notified testing agency — ARAI in Pune and ICAT in Manesar are the two names most importers encounter, and both are accepted for L-category work. The application is accompanied by a technical dossier: dimensional drawings, a bill of materials with supplier names for safety-critical parts, the REESS specification including cell type and chemistry, the charger specification, the BMS functional description and protection thresholds, and the test reports already obtained for the battery pack.

The agency then inspects the prototype and runs the vehicle-level tests. In practice, the sequence that works is battery first, vehicle second: a pack that has not yet passed AIS-156 cannot support a vehicle approval, and running them in parallel usually means paying for the vehicle test twice. Once testing is complete and any non-conformities are closed, the agency issues a certificate of compliance, which becomes the basis of the type approval certificate.

Approval is model- and variant-specific. A change of cell supplier, a change of BMS firmware that alters protection thresholds, a change of charger or a meaningful change in pack architecture is a change to the certified configuration and should be notified to the agency rather than introduced silently. Importers who swap a cell supplier mid-programme to protect margin, without telling anyone, are the ones whose second shipment gets held at the port because the documents describe a product that no longer exists.

The table below sets out the test items that most often decide the outcome, and what each one is really looking for.

TestWhat it simulatesTypical failure it exposes
VibrationA vehicle lifetime of road inputChafed harness, cracked busbar joint, loose cell holder
Thermal propagationOne cell in runaway inside the packNo internal barrier, no vent path, single-point temperature sensing
External short circuitA damaged cable or a crashed vehicleContactor welded closed, fuse sized above the cable rating
Overcharge and over-dischargeCharger fault, BMS misreporting SOCProtection threshold set outside the cell maker's window
Over-temperatureCharging or climbing in 45 °C ambientTemperature sensor placed away from the hottest cell
IPX7 immersionFlooded road, monsoon, washed vehicleGasket compressed at a moulding line, unsealed connector cavity
Insulation and dielectricAged or damaged insulationCreepage distance too small at the BMS board edge

Factory inspection and the two-year surveillance cycle

Type approval is not a desk exercise. The agency inspects the manufacturing plant to confirm that the product tested can be reproduced, and the inspection focuses on the processes that control Battery Safety rather than on the showroom.

Auditors typically ask to see incoming inspection records for cells, including the cell maker's batch certificate and the measurement of open-circuit voltage and internal resistance on receipt. They look for cell traceability from the finished pack back to the cell batch, usually through a serial number that appears on the pack label and in a production record. They check the torque control on busbar and terminal fasteners — a calibrated torque tool with a recorded value per vehicle, not a rattle gun. They check ESD control on the BMS assembly line, because a board that has been handled without grounding can pass final test and fail in the field. They check that the end-of-line insulation and Hi-pot tester is calibrated and that the test result is recorded against the pack serial.

Surveillance then continues on a cycle that is commonly every two years, with the certificate remaining valid while the standard and the product are unchanged. The practical consequence for an importer is that the factory relationship has to survive longer than one shipment. A trading company that switches assembly plants between orders breaks the traceability chain the approval depends on, and the certificate becomes difficult to defend even if nothing has changed in the product.

This is the point where a factory audit done for your own commercial protection and a factory inspection done for the regulator overlap. The evidence you gather for one — process capability, calibration records, incoming inspection, containment of non-conforming packs — is largely the evidence the other asks for, which is why it is worth structuring the audit around the certification requirements rather than around a generic checklist. Our guide to auditing an electric scooter factory covers the process side in detail.

Related obligations: BIS standards, battery waste rules and subsidy conditions

Three obligations sit alongside the type approval and are frequently discovered late.

The first is the BIS standards family. IS 17855:2022 covers performance requirements for lithium-ion traction packs. IS 16893 covers cells. IS 18590:2024 and IS 18606:2024 address powertrain and battery safety. The IS 17017 series covers conductive charging equipment. Whether a given product needs an ISI licence or a self-declaration depends on the current quality control order in force, and that list changes, so it should be checked against the BIS notification in effect at the time of import rather than against a supplier's assertion that "we are BIS certified".

The second is extended producer responsibility under the Battery Waste Management Rules 2022. A producer placing batteries on the Indian market is required to register on the central portal and to meet collection and recycling targets through registered recyclers. This is a producer obligation, and an importer that puts its own brand on the product is a producer. The Registration is not transferable to the Chinese manufacturer, and the targets are calculated on the weight of batteries placed on the market, so they scale with volume. A launch plan that ignores EPR registration will find itself with an inventory problem rather than a compliance problem, because the batteries cannot be disposed of through an unregistered channel.

The third is subsidy eligibility. Successive demand-incentive schemes have tied consumer incentives to vehicles that are certified by designated agencies and that meet localisation thresholds for cells, magnets, controllers and other components. Two consequences follow. Certification is a precondition for a subsidised price position, not an optional extra, and the eligible model list is a commercial battlefield in its own right. A product that is technically compliant but not on the eligible list competes at a structural price disadvantage against one that is. Importers should treat the localisation content of the bill of materials as a design input, agreed with the factory before tooling, rather than as a paperwork exercise after the fact.

The Indian approach to battery safety is stricter on thermal propagation than several other markets, and for good reason: the failure mode it addresses is a fire in a dense urban environment, often in a home or a stairwell. If you are comparing regimes, the same logic runs through our guide to lithium battery fire safety and through the Chinese framework described in CCC certification for electric motorcycles.

Samples, cost and realistic timelines

The sample requirement is the first thing to get right, because samples are expensive to ship and a short submission restarts the clock. A typical AIS-156 submission for a scooter pack runs to around four battery packs for the abuse and environmental test series, plus one pack dedicated to the thermal propagation test — that pack is destroyed and cannot be reused — plus a charger for the charging-safeguard assessment. Some agencies also want a complete vehicle for the on-road and EMC work, which means a second shipment if the pack and the vehicle are not sent together.

Testing commonly takes around six to eight weeks after the documentation is accepted, and the documentation review is its own delay. Realistically, a first-time importer should plan on four to six months from dossier submission to certificate in hand, with the largest single variable being how quickly non-conformities are closed. A thermal propagation failure is not a two-week fix; it is a pack redesign with new tooling for the enclosure or the cell holder, followed by a re-test.

On cost, the useful discipline is to budget by driver rather than by a single quoted figure. The cost of Indian approval is driven by the number of tests in the applicable series, the number of samples and their freight and Dangerous Goods handling, the agency's fee per test, the travel and time cost of the factory inspection, and — the item most often omitted — the probability of a repeat test. On a first submission from a factory that has not previously certified to AIS-156, that probability is not small. Ask the factory which Indian certificates it already holds for other customers, and ask to see the certificates rather than a summary. A pack that has already passed AIS-156 for another brand is a very different commercial proposition from one that has passed only GB standards in China.

There is a sequencing decision worth making early. If the same platform is intended for India, the EU and Australia, the battery architecture should be designed against the strictest of the three at the outset, because retrofitting a thermal barrier and additional temperature sensing into a pack that was laid out for a less demanding standard usually means a new enclosure. Our comparison of certification routes in Japan and Canada and of Australian ADR approval sets out the same trade-off in different regulatory language.

Frequently asked questions

Is AIS-156 certification mandatory for electric scooters in India?

Yes, for L-category electric vehicles placed on the Indian market. AIS-156 governs the rechargeable energy storage system, and compliance is assessed as part of the vehicle type approval process under CMVR Rule 126. A vehicle cannot obtain type approval on the basis of a battery report issued against a different standard, and a European or Chinese battery certificate is supporting evidence at best, not a substitute.

What does the thermal propagation test involve?

A single cell inside the pack is deliberately driven into thermal runaway, and the pack must show that the event is contained or slowed so it does not cascade into neighbouring cells, with a warning given to the rider before a hazardous condition develops. The trigger method — localised heating, nail penetration or overcharge — is agreed with the test agency. The pack is destroyed by the test, which is why a dedicated sample is needed.

Which agency issues the type approval certificate?

Testing and certification are carried out by a notified testing agency. ARAI in Pune and ICAT in Manesar are the two agencies most importers work with for L-category vehicles. The agency tests the prototype, closes non-conformities and issues the compliance certificate that underpins the type approval. The choice between agencies is usually driven by scheduling availability and by which agency has previously assessed the platform.

How many samples are needed and how long does testing take?

A typical submission uses around four packs for the abuse and environmental series plus one pack dedicated to thermal propagation, and a charger for the charging assessment. Testing commonly runs six to eight weeks after the documentation is accepted. End to end, a first-time applicant should plan on four to six months, with the main variable being the time needed to close non-conformities and re-test.

Do I need a factory audit in India as well?

No — the factory inspection is of the plant where the product is made, which is normally the factory in China. The agency inspects it to confirm that the tested product can be reproduced, looking at incoming cell inspection, traceability, torque control, ESD control and calibrated end-of-line testing. Surveillance visits typically continue on a two-year cycle for as long as the certificate is relied upon.

Does certification make my product eligible for subsidy?

Not automatically. Demand-incentive schemes have their own eligibility conditions, which include certification by designated agencies but also localisation thresholds for cells, magnets, controllers and other components, and the model must appear on the eligible list. Certification is a precondition rather than a guarantee, and the localisation content of the bill of materials should be agreed with the factory before tooling is committed.

Key takeaways

  • India requires its own vehicle type approval under CMVR Rule 126 — CE, EEC and CCC certificates are not recognised as substitutes.
  • AIS-156 governs the battery pack and is stricter than many markets on thermal propagation, audio-visual warning and microprocessor-based BMS protection.
  • Run the battery approval before the vehicle approval; a pack that has not passed AIS-156 cannot support a vehicle certificate.
  • Plan for roughly five packs and a charger, six to eight weeks of testing, and four to six months end to end on a first submission.
  • BIS certification, EPR registration under the Battery Waste Management Rules and subsidy eligibility are separate obligations that sit outside the type approval.
  • Any change of cell supplier, BMS firmware threshold or pack architecture is a change to the certified configuration and must be notified, not absorbed.

If you are evaluating India as a launch market, the cheapest conversation is the one held before the pack layout is frozen. We can review the AIS-156 implications of a proposed battery architecture, tell you which existing certificates a factory actually holds, and set out the sample and timeline plan against your launch date — start with our company profile and then contact us with the platform specification, and we will respond with a certification route rather than a brochure.

自定义分享代码 

Share This Article

  

Add comment

Add comment:

  • Maggie

    Maggie

  • 二维码2

    David

Message Inquiry
Ready to Get Started? Your email address will not be published. Required fields are marked *
Submit